Cambridge

This 24 lot residential subdivision included both off-site design for sewer extension and onsite design with sewer and permeable pavement.  Following an in depth evaluation of soil and terrain characteristics, we designed permeable roadways and individual infiltration systems for roof runoff.

By preparing the roof infiltration design early and during the subdivision review, the home building process went smoother and faster.